And so we are anticipating a good response on this coming Sat, preparing to built the structure designed by Tri and I.
This structure is designed to be the bow of the ship, featuring a play group, including a suspension pole and the "wind sail"
Pictures of the Model will be uploaded soon.
This skills required are : Square Lash, Round turn 2 halves, Pegging, Sheer lash and Clove Hitch
More details to be posted on a later date
Monday, November 23, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment